Jan. 26th, 2008

days_unfolding: (Default)

  • Stove knob--done

  • Garbage disposal--done

  • Blinds--placed order

  • Kitchen and bathroom faucet--done

  • Bathroom floor measured--need contractor to look at floor

  • Removed bathroom toilet--installation time TBD

  • Have slow drains fixed--not yet

  • Researched shower resurfacing--will wait until the rest of the work on the bathroom is done

  • Researched cleaning shower doors

  • Cabinet doors--need to hire handyman, but not yet

  • Screen--need new screen, but not yet

  • Garage door--need new manual lock because key is missing

  • Buy window locks


Yikes.

Profile

days_unfolding: (Default)
days_unfolding

June 2025

S M T W T F S
1 2 34 5 6 7
891011121314
15161718192021
22232425262728
2930     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 8th, 2025 02:03 pm
Powered by Dreamwidth Studios