Jan. 26th, 2008

days_unfolding: (Default)

  • Stove knob--done

  • Garbage disposal--done

  • Blinds--placed order

  • Kitchen and bathroom faucet--done

  • Bathroom floor measured--need contractor to look at floor

  • Removed bathroom toilet--installation time TBD

  • Have slow drains fixed--not yet

  • Researched shower resurfacing--will wait until the rest of the work on the bathroom is done

  • Researched cleaning shower doors

  • Cabinet doors--need to hire handyman, but not yet

  • Screen--need new screen, but not yet

  • Garage door--need new manual lock because key is missing

  • Buy window locks


Yikes.

Profile

days_unfolding: (Default)
days_unfolding

July 2025

S M T W T F S
   1 2 3 4 5
67 8 9 10 11 12
13 14 15 16 17 18 19
20 21 2223 24 25 26
27 28 29 3031  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 31st, 2025 07:41 pm
Powered by Dreamwidth Studios